|
InspectorRectum |
|
||
|
Hey, long time no post.. I'm still up for a TB, just confirming
|
||
Top | |
FAST-XR |
|
|||
|
all im waiting on is the new butterflies to be cut, im hoping to have them this week, or at least some of them...
_________________ 07 BF MKII XR6T |
|||
Top | |
InspectorRectum |
|
||
|
Sweet! Well how much is it gonna be if I send you 2 TBs? Is that even an option anymore?
|
||
Top | |
FAST-XR |
|
|||
|
before i get any more happening i want to get this lot out of the way 1st, i may buy them off you at a later date...
_________________ 07 BF MKII XR6T |
|||
Top | |
InspectorRectum |
|
||
|
how the TBs going? any progress?
|
||
Top | |
FAST-XR |
|
|||
|
im still waiting on the new butterflies, they shouldnt be too much longer, the person machining them is waiting for a chance to slip them in between production.
i will definately be letting everyone know when they are done
_________________ 07 BF MKII XR6T |
|||
Top | |
FAST-XR |
|
|||
|
UPDATE:
butterflies have now been completed, ill be picking them up on monday afternoon, i should hopefully have them all posted by the end of the week... please pm me to organise payment/postage details...
_________________ 07 BF MKII XR6T |
|||
Top | |
rushed |
|
|||
|
done and sent
looking forward to this, new tb, manifold, cam, tune funfunfun |
|||
Top | |
FAST-XR |
|
|||
|
yes after a couple of set backs, its finally happening!
if anyone plans on doing some before and after dyno runs please post them up, that would be great!
_________________ 07 BF MKII XR6T |
|||
Top | |
FAST-XR |
|
||||||
|
Here are some happy snaps, i rebuilt 3 TBs last night, and as you can see i have stacks of butterflies... im very happy with the quality of the machining and the tolerance is prefect.
as some of these casting are quite old they have some back stains on them, id like to clean them up properly before i send them, so far ive tried degreaser, thinners, metho, brake cleaner, houshold cleaners, and cant get it off... does anyone have any good ideas on how to clean them up? otherwise i have some high temp silver paint i was going to paint them with... i have so far recieved payments from rushed twindongs shortshift weeman i will have these posted as soon as i build them all up and clean them up (or paint them), if you dont want me to paint them please let me know soon... i want to post them thursday
_________________ 07 BF MKII XR6T |
||||||
Top | |
twindongs |
|
||
|
hmm try shellite, its a metal cleaning product. or maybe even a metal polish (like for rims etc)
dont sure if i would want the inside of the tb painted, would it only be the outside?
_________________ El xr6 |
||
Top | |
Shortshift |
|
|||
|
It sounds like they need to be put in an acid bath. But, if you want to paint my throttle body, it's fine by me.
_________________ AU2 XR8 with Raptor VL, ported Yella Terra GT40P heads, Scorpion 1.6 RRs, XE264HR-14 Comp Cam, ceramic coated Hurricane Headers, 60lb injectors, Walbro 255, 200cfi cats, 3" exhaust & Snow Performance water methanol injection |
|||
Top | |
rushed |
|
|||
|
please dont paint my one, as ill be smoothing it with the dremel and painting mine, to suit manifold paint etc.
|
|||
Top | |
FAST-XR |
|
|||
|
no problems, its only one that still looks filthy even though its been cleaned, ill spray that one only and ill give it to short shift
im hoping to pack a few tonight and send them off tomorrow
_________________ 07 BF MKII XR6T |
|||
Top | |
FAST-XR |
|
|||
|
i havent posted any yet but i have packed all of them over the long weekend so they are all ready to go... ill try to get down to the post office today
thanks
_________________ 07 BF MKII XR6T |
|||
Top | |
Who is online |
---|
Users browsing this forum: No registered users and 9 guests |